From the Ashes

The Hakan Peat Power Plant is the largest power producer in Rwanda. They asked us to pave the internal roads of their working power plant as part of the third project we completed together.

Don’t Break the Power Plant

As important as a paved road and adequate drainage was, it was more important to not disrupt the administration or power supply of the plant which remained in operation during our work. The message was simple, “don’t break the power plant”.

Everything went as planned due to careful joint planning, and the works were completed without incident carefully in six months.

Previous
Previous

Bikenge-Rugari HDPE Water Pipeline